Newton, NJ

Install one (1) new Single Stage RBC Unit with total surface area of 164,700 SF.
IMG
IMG
IMG

Project Description

Over the course of this RBC Unit install, we were able to furnish the labor, materials and equipment required to rig, remove, cut up and dipose of the existing RBC Unit. We then provided the following for furnish and install:

  • Central steel shaft with integral torque rings
  • Media support structure
  • Media pack module assemblies with disc media
  • Media pack module assembly support rods
  • Shaft bearings
  • Shaft bearing base plates
  • Drive assembly including:
    • Reducer assembly
    • Reducer base
    • Adjustable motor mount
    • Motor
    • V-belt and sheave assembly
    • Belt guard
      • Adjustable torque arm
      • Hydraulic load cell transducers
      • Stainless steel anchor bolts

 

Completed By

Rapid Pump & Meter Service Co.

The Rapid Group uses cookies and similar technologies as strictly necessary to make our site work. We and our partners would also like to set additional cookies to analyze your use of our site, to personalize and enhance your visit to our site and to show you more relevant content and advertising.